Michael Kors Component Engineering

About the project
No items found.
Project Summary

Redesigned the signature cord tip used with 3mm cord by enlarging the top opening for efficient sewing while maintaining a secure fit below. The change improved durability and significantly reduced retail and production losses.

location

Client

Michael Kors

role

Led development and optimization of accessory components within a scaled production environment.

Date

January 5, 2014

outcome

Increased efficiency and consistency across production, with components that perform reliably at scale.

Production Thinking

Simplified construction for manufacturability while maintaining brand consistency and quality perception.

Product SYSTEM

Standardized hardware elements deployed across multiple product lines.

Problem Opportunity

Optimize accessory components for high-volume production—balancing cost, consistency, and perceived value.